Services


Cleaning Options

  • By Client
  • Contracted to 3rd Party
  • Contracted to Supplier

Maintenance Options (After 1st Year)

  • By Client
  • Contracted to 3rd Party
  • Contracted to Supplier

Commissioning

Transport and crane operations at your site. We connect the toilet to the sewage network and to the water supply, check the water pressure and the hydraulic circuit. With the agreement of your electricity provider you will connect the mains to the electricity cabinet and apply for the technical acceptance of the lavatories. Our technician will putt the toilet in workin condition and will train your maintenance people.

Technical Responsibility

You will be technically and financially responsible following the site preparation, before the arrival of our unit, and during its installation on site.

Connections Required On Site

  • Water pressure for a normal use of the cabin should not be under 4 bars. Otherwise a compressor or similar device must be added to the installation at an additional cost available on request.
  • Water hardness - Normal
  • Electricity feeding: 220V - 50 Hz single phased
  • Minimum electrical power 6KWA
  • Electrical cable section 6mm2
  • Water supply through a 126/32 polyethylene plymouth
  • An earth rod, 25mm2 bare copper cable one cut-off strip

Access and Safety Requirement For Commissioning

Cabins will be delivered to the place indicated by the buyer. Please note the following requirements applicable to any unloading place and to the election site. Truck: 26 tons self propelling crane 18 tons/m minimum, must have space enough in order to move and to operate. If the buyer requires for the delivery of our cabins on a buildin site on an unsuitable road or track, or out of a road usually opened to the public traffic the truck driver may refuse to complete the delivery. However, even if the truck driver accepts to go on, we decline our responsibilities should damages raise at the entry of or on the construction site (road coatings, pipes, cast iron pieces) caused by the weight of the truck or of the dimensions of the crane.

It is your responsibility to ensure that the unfolding arm of the crane keeps our of the reach of the overhead (high and medium overhead electrical lines) and that the safety distances as well as individual safety equipment behaviour and normal precautions towards the general public are respected as required by your applicable laws and regulations.