Commissioning
Transport and crane operations at your site. We connect the toilet to the sewage network
and to the water supply, check the water pressure and the hydraulic circuit. With
the agreement of your electricity provider you will connect the mains to the electricity
cabinet and apply for the technical acceptance of the lavatories. Our technician will
putt the toilet in workin condition and will train your maintenance people.
Technical Responsibility
You will be technically and financially responsible following the site preparation,
before the arrival of our unit, and during its installation on site.
Connections Required On Site
-
Water pressure for a normal use of the cabin should not be under 4 bars. Otherwise
a compressor or similar device must be added to the installation at an additional
cost available on request.
- Water hardness - Normal
- Electricity feeding: 220V - 50 Hz single phased
- Minimum electrical power 6KWA
- Electrical cable section 6mm2
- Water supply through a 126/32 polyethylene plymouth
- An earth rod, 25mm2 bare copper cable one cut-off strip
Access and Safety Requirement For Commissioning
Cabins will be delivered to the place indicated by the buyer. Please note the following
requirements applicable to any unloading place and to the election site. Truck: 26
tons self propelling crane 18 tons/m minimum, must have space enough in order to move
and to operate. If the buyer requires for the delivery of our cabins on a buildin
site on an unsuitable road or track, or out of a road usually opened to the public
traffic the truck driver may refuse to complete the delivery. However, even if the
truck driver accepts to go on, we decline our responsibilities should damages raise
at the entry of or on the construction site (road coatings, pipes, cast iron pieces)
caused by the weight of the truck or of the dimensions of the crane.
It is your responsibility to ensure that the unfolding arm of the crane keeps our
of the reach of the overhead (high and medium overhead electrical lines) and that
the safety distances as well as individual safety equipment behaviour and normal precautions
towards the general public are respected as required by your applicable laws and regulations.